NEW QUESTION 43
Which one is not included in the business migration evaluation survey? (Multiple choice)

  • A. Data-level disaster recovery
  • B. Data center-level disaster recovery
  • C. Application-level disaster recovery
  • D. Business-level disaster recovery

Answer: A,C,D

 

NEW QUESTION 44
Which of the following products comes with warranty service that is not basic maintenance?

  • A. access
  • B. storage
  • C. Digital pass
  • D. transmit

Answer: B

 

NEW QUESTION 45
Resource preparation is one of the most important links before the implementation of the data center project, and it also directly determines the quality and progress of the construction. Generally, preparation is made from the following five points of man, machine, material, law and ring.

  • A. False
  • B. True

Answer: B

 

NEW QUESTION 46
Which of the following components are used by FusionACCess to publish application virtualization?

  • A. WI
  • B. FROM
  • C. HDC
  • D. APS

Answer: D

 

NEW QUESTION 47
The smaller the PUE value, the higher the degree of greening of a data center.

  • A. False
  • B. True

Answer: B

 

NEW QUESTION 48
data center L1 integration interface content includes (multiple choice)

  • A. Machine room decoration, fire protection system
  • B. HVAC water supply and drainage system
  • C. Cabinet, machine room management, integrated wiring
  • D. Power supply and distribution system, lightning protection grounding

Answer: A,B,C,D

 

NEW QUESTION 49
The key content of the customer tender includes (multiple choice)

  • A. Bid evaluation for the commercial part
  • B. Terms of Contract
  • C. Tender threshold
  • D. Bid evaluation technical part

Answer: A,B,C,D

 

NEW QUESTION 50
According to the requirements of the international GB 50174-2008 "Electronic Information System Computer Room Design Code" for the structure, the seismic fortification of the A-class computer room should not be less than two categories.

  • A. True
  • B. False

Answer: B

 

NEW QUESTION 51
The following () belongs to the self-developed products of the energy base product line (multiple choice)

  • A. Chillers
  • B. Air conditioning between rows
  • C. NEtECo monitoring system
  • D. Ups

Answer: B,C,D

 

NEW QUESTION 52
The total integration mode can be completed by one bidding.

  • A. False
  • B. True

Answer: B

 

NEW QUESTION 53
The PUE value is the ratio of the overall power consumption of the computer room to ().

  • A. Lighting consumes electricity
  • B. Air conditioning consumes electricity
  • C. UPS hole power
  • D. IT equipment consumes power

Answer: D

 

NEW QUESTION 54
Which of the following scenarios does not require service migration services?

  • A. Create a new business scenario and plan to purchase Huawei's virtualization platform
  • B. The scenario where the original business platform is about to be insured/insured, and it is planned to purchase Huawei's virtualization platform
  • C. The performance of the original service platform can no longer meet the business needs, and the Huawei virtualization platform is purchased to improve performance
  • D. The original business platform space can no longer be expanded, and the purchase of Huawei's virtualization platform provides a larger capacity space

Answer: A

 

NEW QUESTION 55
For customers, the total integration mode only needs to manage one integrator, and the management difficulty and professional requirements are reduced.

  • A. False
  • B. True

Answer: B

 

NEW QUESTION 56
The investment model of the cloud IDC project government is as follows. (Multiple choice)

  • A. Fiscal allocation model
  • B. BT mode
  • C. Crowdfunding mode

Answer: A,B

 

NEW QUESTION 57
What are the tools that underpin the SmartNOS service?

  • A. Service-turbo
  • B. Packet tracer
  • C. Ensp
  • D. Smartkit

Answer: A

 

NEW QUESTION 58
What is the quotation method of integrated project management?

  • A. Configurator
  • B. Standard manual quotation
  • C. SCT

Answer: B

 

NEW QUESTION 59
Backup service process, excluding the following ().

  • A. Research and evaluation
  • B. Experimental mode
  • C. On-site delivery
  • D. Modernization

Answer: D

 

NEW QUESTION 60
GSM-R evaluation and optimization service expansion strategy is incorrect:

  • A. GSM-R Optimization Services and Planning and Design Services are sold in packages and cannot be split
  • B. GSM-R new networks must bundle network premium services
  • C. Customers have purchased maintenance services and do not need to purchase online preferential services
  • D. GSM-R Centralized Network Optimization and GSM-R Expert Support Optimization Services are expanded by collecting existing network issues and network assessment models

Answer: C

 

NEW QUESTION 61
Huawei's ICT talent training business architecture is based on clear ideas, and an end-to-end talent training solution is formed through the curriculum system, teaching environment, and certification system, and through consulting planning, program design, and accompaniment.

  • A. False
  • B. True

Answer: B

 